Sonntag, 16. Januar 2011
The book is now available and in bookstores. Everything else is on my homepage www.johann-gradl.de .
Magirus 170 D 11 Of Www.spuren-hinterlassen.com
Sunday, January 16, 2011
Saturday, January 15, 2011
Pokemon Chaos Black Rom
Winter Work 2010 / 2011 Part 2 (finishing)
I kanm good with the sewing front, so he had insisted today on its maiden flight successfully 15/01/2011 .....
Hir the pictures:)
Some figures as Spike :
size: over 5m
Construction time: about two months
material consumption: 129m cloth, bridle line 37m, 40m reflector tape
I kanm good with the sewing front, so he had insisted today on its maiden flight successfully 15/01/2011 .....
Hir the pictures:)
Some figures as Spike :
size: over 5m
Construction time: about two months
material consumption: 129m cloth, bridle line 37m, 40m reflector tape
Subscribe to:
Posts (Atom)